The Connect2 bridleway and footpath bridge over the river Goyt at Chadkirk was delivered on 12th June 2012 and will be installed on 20th June 2012.
Arrival of the Connect2 Bridge
Have a look at these pictures taken by local photographer and Civic Society member Arthur Procter of the bridge arriving in two halves. Click here for photos.
No comments:
Post a Comment