Friday, 15 February 2013

Repair Work to Toll House at Top Lock on the Peak Forest Canal

The Canal & River Trust report that recent repair works have been carried out to the Toll House at Top Lock on the Upper Peak Forest Canal. The repair works include: 
  •  repairs to the stair case including stone wall repairs and timber handles
  •  the entrance lobby had minor timber repairs
  •  new fencing around the canal arm was also installed
  •  some redecoration

The estimated cost of the repair works is £5,000


No comments:

Post a Comment